Our Engineers at MartinCSI utilize a very diverse and expansive skill set, including; PLCs- Allen Bradley PLC-5, SLC, MicroLogix, CompactLogix & ControlLogix
- Modicon 984 & Quantum
- Siemens S5 & S7
- GE 90/20, 90/30 & 90/70
- Omron PLC
- Mitsubishi Q Series, A Series & K Series
- EZ Automation
- Pro-Face PLC/HMI
- Yaskawa GL60 & GL120
|  |
HMI Software- Intellution
- Wonderware
- GE/Fanuc Proficy HMI/SCADA iFix
- RSView
|  |
Industrial Networking- Industrial Ethernet
- Devicenet
- Profi-Bus
|  |
OEE - Overall Equipment Effectiveness | AvailabilityAvailability takes into account Down Time Loss, and is calculated as: Availability = Operating Time / Planned Production Time |
PerformancePerformance takes into account Speed Loss, and is calculated as: Performance = Ideal Cycle Time / (Operating Time / Total Pieces) |
Ideal Cycle Time is the minimum cycle time that your process can be expected to achieve in optimal circumstances. It is sometimes called Design Cycle Time, Theoretical Cycle Time or Nameplate Capacity.
Since Run Rate is the reciprocal of Cycle Time, Performance can also be calculated as: Performance = (Total Pieces / Operating Time) / Ideal Run Rate |
Performance is capped at 100%, to ensure that if an error is made in specifying the Ideal Cycle Time or Ideal Run Rate the effect on OEE will be limited. QualityQuality takes into account Quality Loss, and is calculated as: Quality = Good Pieces / Total Pieces |
OEEOEE takes into account all three OEE Factors, and is calculated as: OEE = Availability x Performance x Quality |
|
|